A. ISSUANCE OF BUILDING PERMIT

ABOUT THE SERVICE:

A Building Permit is issued by the Building Official to an owner/applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition, or other work activity of a specific project/building/structure or portions thereof after the accompanying principal plans, specifications and other pertinent documents with the duly notarized application are found satisfactory and substantially conforming with the National Building Code of the Philippines and its Implementing Rules and Regulations and the Local Zoning Ordinance.

REQUIREMENTS:
    1. Five (5) sets of plans duly signed and sealed by Licensed Professional Practitioner.
    2. Four (4) copies of Bill of Materials and Estimates signed by License Professional Practitioner
    3. Four (4) copies Building specification duly signed by License

Professional Practitioner

    1. Two (2) sets of structural design/analysis (for 2-storey and above) and 2 sets Soil Analysis (for 4-storey and above) duly signed and sealed by a licensed Civil/Structural Engineer.
    2. Four (4) copies of duly accomplished Application Forms
    3. Photocopy of PRC ID and PTR of License Professional Practitioner
    4. Two (2) xerox copies of notarized Deed of Sale/lease Contract/Consent of Lot Owner.
Other Requirements:
    1. Zoning Clearance from the Office of the Municipal Planning and Development Coordinator
Optional Requirements:
    1. ECC/CNC, Height Clearance, DOH, Others
SERVICE SCHEDULES:

Monday to Friday
8:00 am to 5:00 pm

FEES:

Permit fees  are computed based on the following:

Type of Occupancy
Total floor area of the Project
Cost of the Project
Height of Building/structure

For constructing, installing, repairing, altering or causing any change in the occupancy/use of any building/structure or part thereof or appurtenances thereto without any permit, there shall be imposed a surcharge of one hundred percent (100%) of the building fees. Provided that when the work in the building/structure is started pending approval of the Building Official of the application for the building permit, the amount of surcharge shall be according to the following:

Excavation for Foundation                                             10%
Construction of foundation (including pile driving
and laying of reinforcing bars                                        25%
Construction of superstructure up to two
(2m) above established grade                                        50%
Construction of superstructure above two (2m)          100%

HOW TO AVAIL OF THE SERVICE:
As the client, you

Responsibilities of Person/Department Concerned

It will take

Person(s)/ Department(s) Responsible

1. Secure application forms and other requirements Brief the client regarding the requirements.

5 minutes

Engr. Serafin Mabanag
Engr. Ely G. Leaño
Eddie Sagucio
2. Submit application for building permit and other requirements to the Office of the Building Official (OBO) for evaluation and processing Receive, review and assess the different fees to be collected by the Treasurer’s Office and issues the client.

a) Order of payment

b) Endorsement to the BFP together with the following:

1-set of building plans

1-copy of cost estimates, and

1-copy of building specifications

15 minutes

15 minutes

2 minutes

Engr. Serafin Mabanag
Engr. Ely G. LeañoEddie Sagucio
3. Submit to the OBO personnel: 2-copies Fire Safety Evaluation Clearance and 1-copy of Official receipt of payment of fees  Record the OR and  completely filled- up application forms and prepare the permit for approval

Approval and releasing of permit

1 hour

30 minutes

Engr. Jessabel Ariston
Engr. Ely G. Leaño
Eddie Sagucio
BFP Personnel

B. ISSUANCE OF CERTIFICATE OF ELECTRICAL INSPECTION FOR TEMPORARY POWER CONNECTION AND ELECTRICAL INSTALLATION/WARNING

 

SERVICE SCHEDULE:

Monday to Friday
8:00 am to 5:00 pm

FEES:

Certification fee            Php. 50.00
Inspection fee               Php 120.00

 

HOW TO AVAIL OF THE SERVICE:

As the client, you

Responsibilities of Person/Department Concerned

It will take

Person(s)/ Department(s) Responsible

1. Submit the accomplished application form and other requirements for assessment Receive and conduct the field of inspection and verification and issues order of payment

Maximum of 5 days (it depends upon the location)

Engr. Ely G. Leaño, Jr.
Eddie Sagucio
2. Client presents proof of payment Record the OR and completely filled up application form  and prepare the permit for approval

 

Approval and releasing

1 hour

 

 

30 minutes

Engr. Ely G. Leaño, Jr.
Eddie Sagucio

C. ISSUANCE OF OCCUPANCY PERMIT

ABOUT THE SERVICE:

Upon completion of the project, the owner or the permitee shall apply for an Occupancy Permit at the OBO prior to occupancy.

SERVICE SCHEDULE:

Monday to Friday
8:00 am to 5:00 pm

REQUIREMENTS:
  • Photocopy of the approved building permit,sanitary/plumbing     permit, electrical permit, electronic permit and/or mechanical permit and Fire Safety Evaluation Clearance (FSIC) issued by BFP
  • Certificate of completion of building and electrical permit
  • Logbook duly signed and sealed by supervising civil engineer   and architect
FEES:

Permit fees are computed based on the following: 

Type of Occupancy
Cost of  the Project

HOW TO AVAIL OF THE SERVICE:

As the client, you

Responsibilities of Person/ Department Concerned

It will take

Person(s)/ Department(s) Responsible

1. Submit complete requirements for evaluation Receive and indorse to BFP for issuance of FSIC

2 minutes

Cosme Calumpit, Jr.
2. Submit the FSIC to the OBO Personnel Receive and conduct of final inspection and recommendation

 

 

Compute permit fee and issue order of payment

Maximum of
5 days
(it depends upon the location)

2 minutes

 

 

OBO Personnel

3. Submit official receipt to the OBO Personnel Prepare the permit and completely fill up the application forms for the signature of the approving officers

 

Approval and releasing of permits

30 minutes

 

 

30 minutes

Engr. Jessabel Ariston